HomeAbout MBIDesign Build ConceptProject ProfilesManagementTestimonialsCareersSite MapContact Us
SEARCH 



Design Build

MBI Corporation has utilized the Design/Build process for several office buildings. The Following projects are a few examples:

Knott Laboratories (in Denver) - This was a collaborative effort on the part of MBI and the Owner that addressed the Owners concerns to preserve views from the site as well as to design and build an energy efficient structure.

 

Alpine Family Care (located at The Centre for Advanced Technology in Fort Collins) - This Design/Build medical offices project included assisting the client with site selection as well as the design of the building.

Highline Motors (on South Mason in Fort Collins) - A unique style of automobile showroom/office/shop property designed and built to the Owner's specifications.

 


Drake Tech Centre (located at Drake and Research in Fort Collins) - Phase 1 of a three-phase office park designed and built to create a productive and comfortable work environment with micro climate control. State of the art- technology was used to provide high-speed data and phone connectivity for maximum efficiency.

 

In each of the above cases the Design/Build approach was taken in order to provide the Owner with the best professional expertise in establishing the design for the project, while closely monitoring the project cost during the design and budgeting phases. By entering into Design/Build agreements with the major subcontractors, allows us to design systems which take into consideration both initial and life,-cycle costs, This ensures that buildings are built for efficient and economical long-term operating costs. An example of this efficiency was the design for the HVAC system at The Drake Tech Centre.